Afonso Xavier Canosa Rodriguez


On philology, potatoes and construction.
Well, this is just my first approach to blog-writing. I want it to be the way to keep in touch with colleagues and friends.




Profile
info at canosarodriguez dotnet
 Subjects
 Archive
 PREVIOUS
 Highlights

Support structure for kiwi vines (II)

Formwork

Perhaps this process can be called casting indeed.

1. A mould is built out of lumber. Here I use units 2.5x10cm , 2.5m length.

2. A first layer of concrete is poured into, then rebars (10mm diameter) are dipped in. Finally another layer of concrete is poured until reaching the upper top of the mould.

3. I use no release agent: a higher level of roughness is expected, if too much I would apply a thin layer of mortar after deshuttering.

4. Left at least 20 days for curing.
Subject: construction - Published 08-03-2010 19:57
Permanent link to this article
© by Abertal







Warning: Unknown: Your script possibly relies on a session side-effect which existed until PHP 4.2.3. Please be advised that the session extension does not consider global variables as a source of data, unless register_globals is enabled. You can disable this functionality and this warning by setting session.bug_compat_42 or session.bug_compat_warn to off, respectively in Unknown on line 0